Came Frog-AEP24 Kit User Manual

Browse online or download User Manual for Safety Came Frog-AEP24 Kit. CAME Frog-AEP24 Kit User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
CAME UNITED KINGDOM LTD
UNIT 3
ORCHARD PARK INDUSTRIAL ESTATE,
TOWN STREET, SANDIACRE,
NOTTINGHAM NG10 5BP
TEL: 0115 921 0430
FAX: 0115 921 0431
INTERNET - www.cameuk.com
TECHNICAL
HELPLINE
0115 921 0430
FROG KIT
Installation Instructions
for a “Pair” of gates...
THE FROG-P KIT CONSISTS OF:
2 X UNDERGROUND FOUNDATION CASINGS
2 X UNDERGROUND GATE MOTORS
1 X CONTROL PANEL
1 X RADIO FREQUENCY CARD
1 X TUNED ANTENNA
2 X REMOTE CONTROL TRANSMITTERS
1 X PAIR SAFETY BEAMS
Page view 0
1 2 3 4 5 6 ... 31 32

Summary of Contents

Page 1 - FROG KIT

CAME UNITED KINGDOM LTDUNIT 3ORCHARD PARK INDUSTRIAL ESTATE,TOWN STREET, SANDIACRE, NOTTINGHAM NG10 5BPTEL: 0115 921 0430FAX: 0115 921 0431INTERNET -

Page 2 - INTRODUCTION

2.2 - Wiring the MotorsTHE FROG MOTORS ALWAYS COME PREWIRED AND THE CONNECTIONS TO THE MOTORSHOULD BE MADE IN THE JUNCTION BOXES AT THE BASE OF THE GA

Page 3 - CONTENTS

2.3 - Wiring in the Safety PhotocellsSAFETY BEAMS SHOULD BE FITTED APPROXIMATELY15 INCHES FROM GROUND LEVEL2.4 - Inserting the Radio Frequency CardSAF

Page 4

2.5 - Wiring in the Tuned Antenna2.6 - Coding the Remote Controls1. REMOVE THE BATTERY COVER & CASING OF THE REMOTE CONTROL HANDSET TOREVEAL THE D

Page 5 - 1.2 - Basic Cable Layout

END OF INSTALLATIONSTAGE 2BEFORE STARTING STAGE 3 - Commissioning the Control PanelPLEASE CHECK THAT YOU HAVE CORRECTLY:Ref Page1. FITTING THE CONTROL

Page 6 - 1.5 - Hanging the Gates

STAGE 3COMMISSIONING THE CONTROL PANEL3.1 - Initial Wiring & Control Panel SetupZA41. CONNECT POWER TERMINALS L1 - L2 AND A SUITABLE EARTH (L2 BEI

Page 7 - 1.6 - Fitting the Gate Lock

5. SELECT DIPSWITCHES 1 & 2 OFF FOR COMMISSIONING6. ENSURE HARD WIRE LINK IS FITTED BETWEEN TERMINALS 1 & 2 AND 2 & C11. MOMENTARILY PULSE

Page 8

2. TO SET THE TOTAL RUNNING TIME OF THE MOTORS, ADJUST POTENIOMETER TL TO ALLOW THE MOTORS TO RUN FOR A FURTHER 5-7 SECONDS AFTER THE MOVE-MENT CYCLE

Page 9 - Fastening screws

1. TO SELECT AUTOMATIC CLOSING,SELECT DIPSWITCH 2 ON.SET THE AUTOMATIC CLOSING TIME BY ADJUSTING POTENTIOMETER TCAFULLY ANTI-CLOCKWISE WILL APPROX. AU

Page 10 - MOTOR 1 MOTOR 2

3.5 - Programming the Remote Controls to the Control PanelTo use the remote control system, proceed as follows:A) Turn power OFF and insert AF radio f

Page 11 - CONTROL PANEL

END OF INSTALLATIONSTAGE 3PLEASE CHECK THAT YOU HAVE CORRECTLY:Ref Page1. SET POWER SETTING, INSERTED MOTORCAPACITORS, SET DIPSWITCHES FORCOMMISSION

Page 12 - REVEAL THE DIAGRAM BELOW

INTRODUCTIONTHESE INSTRUCTIONS WILL SHOW YOU HOW TO INSTALL AFROG UNDERGROUND GATE KIT TO A PAIR OF GATES.PLEASE READ THESE INSTRUCTIONS AND DIAGRAMS

Page 13 - END OF INSTALLATION

4 - TROUBLESHOOTING GUIDEA multimeter will be neededPROBLEMGATE WILL NOT RESPONDWHEN GIVEN A COMMANDGATES ARE OPEN BUTWILL NOT CLOSE ANDGREEN LED IS F

Page 14

PROBLEMIF THE PROBLEM IS STILL APPARENT CONTACT THE CAMETECHNICAL HELPLINE:0115 921 0430GATES WILL NOT RESPOND TOREMOTE CONTROLCOMMAND1. AF FREQUENCY

Page 15 - 1 2

5 - TECHNICAL INFORMATION5.1 - Technical Specification* Can be adjusted using CAME control panels* AN ELECTRIC LOCK IS SUGGESTED WHEN THE GATE WING IS

Page 16

5.4 - Motor Torque SettingsZA4To vary the motor torque, move the indicated spade connector to one of the four posi-tion : 1=min, 4=max.N.B. It is alwa

Page 17

5.4 - Motor Torque SettingsDescription of Control Panel:Micro-processor controlled electrical cabinet powered by 230V (a/c) at 50-60Hz, single phase.

Page 18

Other functions available:Automatic closing: The automatic closing timer is automatically activated at the end of the opening cycle. The pre-set, adj

Page 19

Terminals 1 and 2, 2 and C1 are normally closed circuits and ifthey are not used they must be linkedL1 L2 U V W X Y E1 10 11

Page 20 - 4 - TROUBLESHOOTING GUIDE

5.7 - Control Panel AdjustmentsTrimmer T.L - Adjustment of operating time from a minimum of 0 seconds to a maximum of 120 seconds N.B. it is advised t

Page 21 - 0115 921 0430

5.8 - Electrical ConnectionsL1 L2 U V W X Y E1 10 11 1 2 3 5 7 C1L1L2UWVXWYWE1

Page 22 - 5 - TECHNICAL INFORMATION

CENTRE STOP90° 90°5.9 - Re-Handing the Frog MotorsRIGHTLEFTON RECEIPT YOUR FROG MOTORS WILL HAVE BEEN SETUP FOR YOU AS APAIR I.E LEFT HAND AND RIGHT H

Page 23 - SEE ALSO PAGE 14

INSTALLATION INSTRUCTIONSCONTENTS1) Stage 1:- Civil & Mechanical Section Page1.1 INSTALLATION OF THE FOUNDATION 31.2 BASIC CABLE LAYOUT 41.3 LOW V

Page 24

NOTES29

Page 25

NOTES30

Page 26 - 5.6 - ZA4 Wiring Diagram

6. CONTACT INFORMATIONCAME UNITED KINGDOM LTDUNIT 3ORCHARD PARK INDUSTRIAL ESTATETOWN STREET, SANDIACRE, NOTTINGHAM NG10 5BPTEL: 0115 921 0430FAX: 011

Page 27

STAGE 1CIVIL & MECHANICAL SECTION1.1 - Installation of Foundation CasingsTHE UNDERGROUND CASING SHOULD BE CONCRETED IN THE GROUND. THE CASINGSHOU

Page 28 - 5.8 - Electrical Connections

1.2 - Basic Cable LayoutTHIS DIAGRAM DETAILS THE BASIC CABLE LAYOUT FOR A PAIR OF MOTORS.THE POWER SUPPLY TO THE CONTROL PANEL SHOULD BE LIVE AND PROT

Page 29 - CENTRE STOP

1.4 - Installing the MotorsINSERT THE MOTORS ONTO THE STUDS IN THE CASING. IF THE GATES ARE HUNGBETWEEN THE POSTS AND THE GATES OPEN INWARDS THE MOTO

Page 30

1.6 - Fitting the Gate Lock6Secure the unlocking device to the FROG shoe with the 4 allen bolts provided.To release the gate, raise the protective cap

Page 31

END OF INSTALLATIONSTAGE 1BEFORE STARTING STAGE 2 - Wiring & ElectricalPLEASE CHECK THAT YOU HAVE CORRECTLY:Ref Page1. INSTALLED THE FOUNDATION CA

Page 32 - 6. CONTACT INFORMATION

STAGE 2 - WIRING & ELECTRICAL2.1 - Fitting the Control Panel in the Casing8

Related models: Frog-P Kit | FrogAE-P Kit |

Comments to this Manuals

No comments